Standard

Economic assessment of a complex of measures for the remediation of the territory from technogenic impact. / Provornaya, Irina; Filimonova, Irina; Yurkevich, Nataliya и др.

в: E3S Web of Conferences, Том 265, 04017, 03.06.2021.

Результаты исследований: Научные публикации в периодических изданияхстатья по материалам конференцииРецензирование

Harvard

APA

Vancouver

Author

BibTeX

@article{a9e0e0ecf8c0464e9173d1ad0ae2e8c5,
title = "Economic assessment of a complex of measures for the remediation of the territory from technogenic impact",
abstract = "In this work, an economic assessment of environmental damage to water and land resources is calculated, and the cost of a project for the reclamation of destroyed lands within the territory of the Komsomolsk gold recovery plant is determined. The object of the study is directly the territory of the enterprise, which is located in the Tisulsky municipal district of the Kemerovo region. According to our calculations, the total assessment of environmental damage from the plant's activities amounted to 458 million rubles, of which: 294 million rubles - accumulated environmental damage from water pollution; 164 million rubles - accumulated environmental damage from soil pollution in the surrounding area. The cost estimate of the destroyed land reclamation project amounted to 716.7 million rubles. At the same time, income from the sale of equipment and gold mined in the territory of the tailing dump reaches 3916 million rubles. ",
author = "Irina Provornaya and Irina Filimonova and Nataliya Yurkevich and Vasiliy Nemov and Mikhail Mishenin",
note = "Funding Information: Acknowledgements: The work was supported by Grant of Russian Federation President for young scientists № МК-1819.2020.6 and the basic project of laboratory 1105 No. 0266-2019-0008. Publisher Copyright: {\textcopyright} The Authors, published by EDP Sciences, 2021. Copyright: Copyright 2021 Elsevier B.V., All rights reserved.; SPE Kuwait Oil and Gas Show and Conference 2019, KOGS 2019 ; Conference date: 13-10-2019 Through 16-10-2019",
year = "2021",
month = jun,
day = "3",
doi = "10.1051/e3sconf/202126504017",
language = "English",
volume = "265",
journal = "E3S Web of Conferences",
issn = "2555-0403",
publisher = "EDP Sciences",

}

RIS

TY - JOUR

T1 - Economic assessment of a complex of measures for the remediation of the territory from technogenic impact

AU - Provornaya, Irina

AU - Filimonova, Irina

AU - Yurkevich, Nataliya

AU - Nemov, Vasiliy

AU - Mishenin, Mikhail

N1 - Funding Information: Acknowledgements: The work was supported by Grant of Russian Federation President for young scientists № МК-1819.2020.6 and the basic project of laboratory 1105 No. 0266-2019-0008. Publisher Copyright: © The Authors, published by EDP Sciences, 2021. Copyright: Copyright 2021 Elsevier B.V., All rights reserved.

PY - 2021/6/3

Y1 - 2021/6/3

N2 - In this work, an economic assessment of environmental damage to water and land resources is calculated, and the cost of a project for the reclamation of destroyed lands within the territory of the Komsomolsk gold recovery plant is determined. The object of the study is directly the territory of the enterprise, which is located in the Tisulsky municipal district of the Kemerovo region. According to our calculations, the total assessment of environmental damage from the plant's activities amounted to 458 million rubles, of which: 294 million rubles - accumulated environmental damage from water pollution; 164 million rubles - accumulated environmental damage from soil pollution in the surrounding area. The cost estimate of the destroyed land reclamation project amounted to 716.7 million rubles. At the same time, income from the sale of equipment and gold mined in the territory of the tailing dump reaches 3916 million rubles.

AB - In this work, an economic assessment of environmental damage to water and land resources is calculated, and the cost of a project for the reclamation of destroyed lands within the territory of the Komsomolsk gold recovery plant is determined. The object of the study is directly the territory of the enterprise, which is located in the Tisulsky municipal district of the Kemerovo region. According to our calculations, the total assessment of environmental damage from the plant's activities amounted to 458 million rubles, of which: 294 million rubles - accumulated environmental damage from water pollution; 164 million rubles - accumulated environmental damage from soil pollution in the surrounding area. The cost estimate of the destroyed land reclamation project amounted to 716.7 million rubles. At the same time, income from the sale of equipment and gold mined in the territory of the tailing dump reaches 3916 million rubles.

UR - http://www.scopus.com/inward/record.url?scp=85108332996&partnerID=8YFLogxK

U2 - 10.1051/e3sconf/202126504017

DO - 10.1051/e3sconf/202126504017

M3 - Conference article

AN - SCOPUS:85108332996

VL - 265

JO - E3S Web of Conferences

JF - E3S Web of Conferences

SN - 2555-0403

M1 - 04017

T2 - SPE Kuwait Oil and Gas Show and Conference 2019, KOGS 2019

Y2 - 13 October 2019 through 16 October 2019

ER -

ID: 28865654