Результаты исследований: Публикации в книгах, отчётах, сборниках, трудах конференций › статья в сборнике материалов конференции › научная › Рецензирование
Current Status of VEPP-5 Injection Complex. / Maltseva, Yu I.; Andrianov, A.; Astrelina, K. и др.
27th Russian Particle Accelerator Conference, RuPAC 2021. ред. / Maksim Kuzin; Volker R W Schaa. CERN, 2021. стр. 37-40 (CERN-Proceedings; Том 2021-September).Результаты исследований: Публикации в книгах, отчётах, сборниках, трудах конференций › статья в сборнике материалов конференции › научная › Рецензирование
}
TY - GEN
T1 - Current Status of VEPP-5 Injection Complex
AU - Maltseva, Yu I.
AU - Andrianov, A.
AU - Astrelina, K.
AU - Balakin, V.
AU - Barnyakov, A.
AU - Batrakov, A. M.
AU - Belikov, O. V.
AU - Berkaev, D. E.
AU - Bolkhovityanov, D.
AU - Emanov, F. A.
AU - Frolov, A.
AU - Karpov, G.
AU - Kasaev, A.
AU - Kondakov, A. A.
AU - Kot, N.
AU - Kotov, E. S.
AU - Kurkin, G. Ya
AU - Lapik, R.
AU - Lebedev, N.
AU - Levichev, A.
AU - Martynovsky, A. Yu
AU - Martyshkin, P.
AU - Motygin, S. V.
AU - Murasev, A.
AU - Muslivets, V.
AU - Nikiforov, D.
AU - Pavlenko, A.
AU - Pilan, A.
AU - Rogovsky, Yu
AU - Samoylov, S.
AU - Tribendis, A. G.
AU - Vasiliev, S.
AU - Yudin, V.
N1 - Publisher Copyright: © 27th Russian Particle Accelerator Conference, RuPAC 2021. All rights reserved.
PY - 2021
Y1 - 2021
N2 - VEPP-5 Injection Complex (IC) supplies VEPP-2000 and VEPP-4 colliders at Budker Institute of Nuclear Physics (BINP, Russia) with high energy electron and positron beams. Since 2016 the IC has shown the ability to support operation of both colliders routinely with maximum positron storage rate of 1.7 · 1010 e+/s. Stable operation at the energy of 430 MeV has been reached. Research on further improvements on the IC performance is carried out. In particular control system was improved, additional beam diagnostics systems were developed, monitoring of RF system was upgraded. In this paper, the latest achieved IC performance, operational results and prospects are presented.
AB - VEPP-5 Injection Complex (IC) supplies VEPP-2000 and VEPP-4 colliders at Budker Institute of Nuclear Physics (BINP, Russia) with high energy electron and positron beams. Since 2016 the IC has shown the ability to support operation of both colliders routinely with maximum positron storage rate of 1.7 · 1010 e+/s. Stable operation at the energy of 430 MeV has been reached. Research on further improvements on the IC performance is carried out. In particular control system was improved, additional beam diagnostics systems were developed, monitoring of RF system was upgraded. In this paper, the latest achieved IC performance, operational results and prospects are presented.
UR - http://www.scopus.com/inward/record.url?scp=85130368402&partnerID=8YFLogxK
UR - https://www.mendeley.com/catalogue/4620d282-a93f-34e9-a50f-d535c86117f9/
U2 - 10.18429/JACoW-RuPAC2021-TUA02
DO - 10.18429/JACoW-RuPAC2021-TUA02
M3 - Conference contribution
AN - SCOPUS:85130368402
SN - 9783954502400
T3 - CERN-Proceedings
SP - 37
EP - 40
BT - 27th Russian Particle Accelerator Conference, RuPAC 2021
A2 - Kuzin, Maksim
A2 - Schaa, Volker R W
PB - CERN
T2 - 27th Russian Particle Accelerator Conference, RuPAC 2021
Y2 - 27 September 2021 through 1 October 2021
ER -
ID: 36161841